This policy clearly outlines what labour and tools are provided by the contractor, what the client is responsible for, and how coordination is handled to ensure smooth progress and accountability on-site.
Using the tool is one thing. Using it right — every time — is the SCW difference.
Here’s how we work on-site:
Full surface checks before tile or marble fixing (dry layout, slope test)
Double curing for plaster and RCC (same day + next morning)
Tile fixing with spacers and spirit level — not hand eyeballing
Plaster with guideline patti & plumb — to avoid wavy or uneven walls
Steel bending & layout done per drawing, not random guesswork
Electrical paths marked before cutting, ensuring clean alignment
All core construction labour (e.g., masons, helpers, bar-binders, shuttering workers, tile fitters, etc.) is provided and managed by the contractor. Labour strength is scheduled based on project size and committed timeline.
The contractor will bring all necessary basic hand tools and manual equipment needed for:
Note: These tools are sufficient for standard manual work. Power tools, machines, or special tools (if required) are discussed separately.
The client must provide or arrange for the following unless otherwise agreed in writing:
Failure to arrange these may result in project delays.
For safety and responsibility reasons:
Labour is managed professionally. Clients must:
If labour is mistreated or misused, the contractor reserves the right to withdraw the team and pause work.
The client may be asked to reimburse or arrange replacements.
This policy ensures everyone knows who is responsible for what, and helps avoid confusion or blame during execution. Respect, planning, and communication are the foundation of a smooth build. Let us know at the time of booking if you need clarification or changes to any of the standard tool/labour arrangements.
All core labour is arranged and managed by the contractor.
Yes, the client must provide water and electric connection or generator for site operations.
Yes, basic manual tools are included. Power tools or special equipment may incur extra charges.
You must get written approval. Third-party labour is not allowed without prior consent.
Absolutely not. Our labour is only for assigned construction work.
If the tool is damaged due to misuse by the client or third parties, the client may need to replace or pay for it.
Heavy machinery is not included by default. It can be arranged upon request at additional cost.
Yes, basic sanitation for labour is the client's responsibility unless pre-arranged with us.
Please communicate with the contractor directly. Labour performance is our responsibility.
Delays due to client-side arrangements will affect the overall schedule. Please plan in advance.