Photo Proof of QC
See how SCW shares real-time photo and video proof of every construction stage — from steel tying to slope testing. No drama, no filters. Just visible, honest work updates.
Last Update 24 July 2025
See how SCW shares real-time photo and video proof of every construction stage — from steel tying to slope testing. No drama, no filters. Just visible, honest work updates.
Last Update 24 July 2025
Suresh Contractor Works
At SCW, we believe quality should be seen, not just claimed. That’s why we document every major step of your construction — and send you photo/video proof. Whether you’re living nearby or far away, you’ll always know what’s happening on-site, down to the last tile joint.
We don’t share useless selfies or staged photos. Only the things that matter for quality control:
| Work Stage | What We Capture |
|---|---|
| Before Work Starts | Empty plot, material arrival, surface readiness |
| During Work | Brickwork alignment, RCC pouring, slab vibrator use, electrical piping, steel tying |
| After Work | Level checking, tile finishing, slope testing, curing shots |
| Special Checks | Steel gauge labels, cement bag details, pipe brand codes, tile batch numbers |
We share these either daily or weekly (depending on work speed), via WhatsApp, Google Drive, or hard copy — whatever works best for you.
– No need to visit the site daily
– Get daily or weekly updates — at your convenience
– Catch problems early, if any
– Keep records for future — or in case of disputes
All this becomes part of your final QC Summary Report, handed over at project completion.
We don’t retouch images or hide mistakes. If a tile is cracked or a slope is wrong — we show it exactly as it is, and fix it immediately. That’s why clients trust us even when they’re not around.
Every client gets a photo log for their project, with date-wise entries like:
“Day 12 – First floor RCC completed (vibrator used)”
“Day 34 – Bathroom tile work done (slope test shown)”
“Day 50 – Kitchen granite placed (joint spacing visible)”
It becomes your permanent record — like your home’s medical file.
If work happens daily, yes. Otherwise, we share updates based on stage completion — typically 2–3 times a week or more, depending on project speed.
Yes. Just tell us what you want to track, and we’ll make sure it’s documented clearly.
You can choose WhatsApp, Google Drive, or physical copies. Some clients even request pen drives at the end — we support all options.
Message us immediately. We’ll take corrective action on the same day. That’s why photo proof is powerful — you don’t have to rely only on final inspection.
This is 100% part of our standard service. We’ve been doing this for years — because honest, visible QC helps everyone.
We’re available every day to serve you with quality, trust, and commitment.